ANALISIS RISIKO PENYEBAB KETERLAMBATAN PROYEK PENGEMBANGAN PEMBANGUNAN GEDUNG MARGONO SURADJI YOGYAKARTA BERBASIS PMBOK

##plugins.themes.academic_pro.article.main##

Novika Candra Fertilia
Sediyanto Sediyanto
Ahmad Fuadi

Abstract

The expansion of industry and the growth of development facilities in Indonesia is very rapid, especially the construction of buildings. Then the level of difficulty to manage and run a building project is getting higher. The higher level of difficulty, the longer the duration of time required to complete the project. Even though an activity has been planned as well as possible, it still contains uncertainty that it will run fully according to the plan. This happened to the building construction project in Yogyakarta, where the project experienced a delay of 35%. This study aims to find out the causes that have a high influence on the delay in the project. In this study, the influence value category was calculated using the project risk management calculation approach based on the 2017 PMBOK.

##plugins.themes.academic_pro.article.details##

References

  1. Bakhtiyar, a., soehardjono, a., hasyim, m. H., universitas,), lamongan, i., sipil, j. T., & teknik, f. (2012). Analisis faktor-faktor yang mempengaruhi keterlambatan proyek konstruksi pembangunan gedung di kota lamongan.
  2. Dewi, parami, d. N. M. S. E. E. P. (2019). Faktor-faktor penyebab keterlambatan penyelesaian proyek gedung di kabupaten karangasem. Jurnal ilmiah teknik sipil, 87.
  3. Durdyev, s., omarov, m., & ismail, s. (2017). Causes of delay in residential construction projects in cambodia. Cogent engineering, 4(1). Https://doi.org/10.1080/23311916.2017.1291117
  4. Hammadi, s. Al, & nawab, m. S. (2016). Study of delay factors in construction projects. Iarjset, 3(4), 87–93. Https://doi.org/10.17148/iarjset.2016.3420
  5. Hassan, h., mangare, j. B., & pratasis, p. A. K. (2016). Faktor-faktor penyebab keterlambatan pada proyek konstruksi dan alternatif penyelesaiannya (studi kasus : di manado town square iii). Jurnal sipil statik, 4(11), 657–664.
  6. Ji, y., qi, l., liu, y., liu, x., li, h. X., & li, y. (2018). Assessing and prioritising delay factors of prefabricated concrete building projects in china. Applied sciences (switzerland), 8(11). Https://doi.org/10.3390/app8112324
  7. Kurniawan, d., & rudi, r. (2019). Analisis faktor penyebab keterlambatan proyek bangunan gedung pemerintah di kota bukittinggi. Rang teknik journal, 2(1). Https://doi.org/10.31869/rtj.v2i1.1070
  8. Natalia, m., riswandi, r., mirani, z., partawijaya, y., & misriani, m. (2018). Faktor penyebab kegagalan akibat keterlambatan proyek konstruksi pada bangunan gedung di kota padang. Jurnal ilmiah rekayasa sipil, 15(2). Https://doi.org/10.30630/jirs.15.2.129
  9. Ningrum. (2017). Pengaruh penggunaan metode berbasis pemecahan masalah (problem solving) terhadap hasil belajar ekonomi siswa kelas x semester genap man 1 metro tahun pelajaran 2016/2017. Jurnal promosi jurnal pendidikan ekonomi um metro, 5(1), 145–151.
  10. Oktaviyanti, y., tobing, l., sari, d. P., & wicaksono, a. (2019). Analisis risiko proyek konstruksi dengan importance index dan bow tie analysis.
  11. Raden risang haryo, c. D., mulyadi, l., & iskandar, t. (2020). Delay factors in building construction project of state elementary school. Civil engineering journal (iran), 6(3). Https://doi.org/10.28991/cej-2020-03091488
  12. Situmorang e. Benhart, arsjad tj. Tisano, t. J. (2018). Analisis risiko pelaksanaan pembangunan proyek konstruksi bangunan gedung. Tekno, 16(69).
  13. Waluyo, r. (2014). Kajian faktor penyebab keterlambatan waktu pelaksanaan proyek konstruksi. Kajian faktor penyebab keterlambatan waktu pelaksanaan proyek konstruksi, 17(2), 162. Https://doi.org/10.14710/mkts.v17i2.7882.