ANALISIS PERBANDINGAN VOLUME PEKERJAAN KONSTRUKSI MENGGUNAKAN METODE BIM DAN KONVENSIONAL

##plugins.themes.academic_pro.article.main##

Sekar Melanie Putri Aryadi
Ayu Herzanita

Abstract

A project is an activity in which implementation is limited by time and resources. Every project planning must pay attention to the effective and efficient value so that the project can run well and achieve maximum results and quality as planned. Technology is increasingly used including in the construction sector. The use of Building Information Modeling (BIM) technology is one of the technologies that is widely used to minimize the need for costs and work time and can integrate information about the project directly to the various parties involved. This research was conducted by planning using the 3D BIM concept to see the results of the application of technology on the upper structure work and comparing the results of the calculation of the cost of the upper structure work carried out using the BIM method and the conventional method on the Urban Signature Apartment - LRT City Ciracas, East Jakarta. The research method used involved collecting project data includes shop drawings and material specifications. Then, 3D modeling was carried out using Autodesk Revit software, and existing data was analyzed to determine the volume of work and the total cost incurred. From the calculations, it can be concluded that using 3D BIM technology with Autodesk Revit software shows 6.69% difference compared to conventional methods.

##plugins.themes.academic_pro.article.details##

References

  1. Andre Borrman, dkk. 2018. Building Information Modeling – Technology Foundations and Industry, Springer.
  2. Rizki Dwi, dkk. 2021. Analisa Quantity Take Off dan Rencana Anggaran Biaya Dengan Metode Building Information Modeling (BIM) Menggunakan Software Autodesk Revit 2019 (Studi Kasus: Gedung LP3 Universitas Negeri Semarang). dinamika TEKNIK SIPIL, 14(1), 27-31.
  3. Hani, dkk. 2016. Manajemen Proyek Konstruksi, penerbit Deepublish, Yogyakarta.
  4. Dwifitra Jumas. 2020. Model Estimasi Biaya Pada Bangunan Gedung, LPMM Universitas Bung Hatta, Padang.
  5. Seng Hansen. 2017. Quantity Surveying, PT. Gramedia Pustaka Utama, Jakarta.
  6. Ahmad Ali K., dkk. 2019. Perbandingan Pengendalian Biaya Mutu dan Waktu Menggunakan Metode Konvensional dan Metode BIM. Prosiding Seminar Intelektual Muda #1, Inovasi Ilmu Pengetahuan, Teknologi, dan Seni Dalam Perencanaan dan Perancangan Universitas Trisakti, Jakarta.
  7. Putri Khodijatus, dkk. 2021. Evaluasi Perancangan Anggaran Biaya dan Waktu menggunakan Metode BIM, Universitas Jember, Jawa Timur.
  8. https://sis.binus.ac.id/2020/03/24/project-constraints/, 2020. Project Constraints, BINUS University, 24 Maret 2020.
  9. Made Pastiarsa, 2015. Menyusun Estimasi Biaya Proyek, Teknosain, Yogyakarta.
  10. Rizal M. R., dkk. 2021. Perbandingan Metode Konvensional Dengan BIM Terhadap Efisiensi Biaya, Mutu, dan Waktu, Politeknik Negeri Jakarta, Depok.
  11. Manlian Ronald, dkk. 2020. Kajian Faktor-Faktor Manajemen Pembiayaan Proyek Dalam Implementasi BIM Pada Proyek Bangunan Gedung, SNITT-Politeknik Negeri Balik Papan, Kalimantan Timur.
  12. Sahadi, 2019. Anggaran Biaya Proyek Konstruksi, Teknosain, Yogyakarta.
  13. Cristopher Triarman, dkk. 2018. Analisis Faktor Penyebab Keterlambatan Waktu Pada Pekerjaan Struktur Atas Proyek Konstruksi, Lembaga Penelitian Universitas Trisakti, Jakarta.