The Serang-Panimbang Toll Road Construction Project is one of the National Strategic Projects (PSN) with a total length of 83,677 km. The main bridge 18, which is one of the projects on the toll road section, has a drill pile foundation for its substructure. The drill pile foundation is a pile foundation that is installed by drilling the ground first, then filling it with reinforcement that has been assembled and cast in concrete. The foundation has a slope that is less than the permitted slope to support the load above it and is built to withstand both vertical and horizontal stresses. This study compared the Reese & Wright method with the Meyerhof method, two bearing capacity estimation techniques. The comparison aims to determine whether the outcomes of the two approaches utilized significantly differ from one another. The findings of the SPT test were used to conduct the analysis of bearing capacity. In this work, drill piles with a 1 m diameter and 15 m depth were used. According to the analysis's findings, the permit's bearing capacity using the Reese & Wright approach was 246.20 tons, however the permit's bearing capacity using the Meyerhof method was found to be 541.87 tons. For the Reese & Wright approach, the single drill pile decreased by 9,07 mm, and the group pile decreased by 25,7 mm; for the Meyerhof method, the single drill pile decreased by 9,17 mm, and the group pile decreased by 25,34 mm. Furthermore, it was found from both methods of calculating the bearing capacity that both stable static loads and dynamic loads work so that the foundation can be categorized (P max < Q single permit). The ratio of the bearing capacity of the single mast permit on the Reese & Wright method compared to the Meyerhof method is 0.478:1.


Keywords: Bearing Capacity, Drilled Pile, Stability.

##plugins.themes.academic_pro.article.details##

References

  1. R. Gunawan, PENGANTAR TEKNIK FONDASI, 5th ed. 1996.
  2. Direktorat Jenderal Cipta Karya Kementerian Pekerjaan Umum Dan Perumahan Rakyat, Buku B Panduan Perencanaan Struktur IPLT. Jakarta, 2017.
  3. M. Dr. Ir. Abdul Hakam, REKAYASA PONDASI. CV. Bintang Grafika.
  4. I. W. A. Basoka, “Perbandingan Daya Dukung Tiang Pancang Berdasarkan Pengujian Cone Penetration Test (CPT) Dan Standard Penetration Test (SPT) Pada Tanah Berpasir,” Tek. SIPIL, vol. 4, no. 1, pp. 126–141, 2020.
  5. H. P. A, Y. M. P, and N. Djarwanti, “PERBANDINGAN ANALISIS KAPASITAS DUKUNG TIANG TUNGGAL PONDASI MINIPILE MENGGUNAKAN RUMUS DINAMIK, HASIL UJI SPT DENGAN HASIL UJI PDA,” eJurnal MATRIKS Tek. SIPIL, pp. 570–577, 2015.
  6. B. S. Nasional, SNI 4153:2008 Cara uji penetrasi lapangan dengan SPT. 2008.
  7. M. S. Putri, Y. Apriyanti, and F. Fahriani, “ANALISIS PERBANDINGAN DAYA DUKUNG DAN PENURUNAN TIANG PANCANG TUNGGAL DENGAN METODE STATIK DAN UJI BEBAN,” Pros. Semin. Nas. Penelit. Pengabdi. pada Masy., pp. 1–6, 2018.
  8. R. Zain, A. Azizi, and M. A. S. Al Fathoni, “Analisis Daya Dukung Dan Penurunan Pondasi Tiang Bor Pada Proyek Pembangunan Gedung K Universitas Muhammadiyah Purwokerto,” CIVeng J. Tek. Sipil dan Lingkung., vol. 2, no. 2, pp. 59–68, 2021, doi: 10.30595/civeng.v2i2.11057.
  9. D. N. Menurut, R. Reese, and W. D. A. N. Penurunan, “ANALISA DAYA DUKUNG PONDASI BORED PILE BERDASARKAN DATA N-SPT MENURUT RUMUS REESE&WRIGHT DAN PENURUNAN,” J. IKRAITH Teknol., vol. 2, no. 7, pp. 7– 13, 2018.
  10. B. M. Das, Principles of Foundation Engineering (Seventh Edition). 2011.
  11. A. A. Prabowo, D. A. Pratama, and P. A. M. Agung, “PERBANDINGAN DAYA DUKUNG ANTARA PONDASI TIANG PANCANG DENGAN PONDASI BOR,” Semin. Nas. Tek. Sipil Politek. Negeri Jakarta, 2019.
  12. U. Jusi, H. Maizir, and J. . Gultom, “Evaluasi Data Uji Lapangan dan Laboratorium Terhadap Daya Dukung Fondasi Tiang Bor,” Semin. Nas. Strateg. Pengemb. Infrastruktur ke-3, vol. 3, pp. 193–203, 2017, doi: 10.21063/spi3.1017.193-203.
  13. L. Livia and A. Suhendra, “STUDI KAPASITAS TIANG BOR BERDASARKAN METODE PILE DRIVING ANALYZER (PDA) DAN LOAD CELL,” JMTS J. Mitra Tek. Sipil, vol. 1, no. 1, p. 82, 2018, doi: 10.24912/jmts.v1i1.2245.
  14. E. Yuliawan and T. Rahayu, “ANALISIS DAYA DUKUNG DAN PENURUNAN PONDASI TIANG BERDASARKAN PENGUJIAN SPT DAN CYCLIC LOAD TEST,” J. Konstr., vol. 9, no. 2, pp. 1–13, 2018.
  15. B. S. Nasional, SNI 1725:2016 Pembebanan untuk jembatan. 2016.
  16. R. A. Fauzih, N. Najib, and N. Santi, “Analisis Daya Dukung Bored Pile Pada Pembangunan Pondasi Jembatan Kali Kenteng dan Kali Serang Segmen Susukan di Ruas Jalan Tol Salatiga-Kartasura, PT. Waskita Karya (Persero), Kabupaten Semarang, Provinsi Jawa Tengah,” J. Geosains dan Teknol., vol. 2, no. 2, p. 87, 2019, doi: 10.14710/jgt.2.2.2019.87-97.
  17. E. Harianti and A. Pamungkas, Desain Pondasi Tahan Gema, 1st ed. Yogyakarta: CV. ANDI OFFSET, 2013.
  18. B. S. Nasional, SNI 8460 : 2017 Persyaratan Perancangan Geoteknik. 2017.