ANALISA KOMPARATIF ANTARA ACUAN PERANCAH SEMI SISTEM DENGAN ACUAN PERANCAH ALUMINIUM. STUDI KASUS : PROYEK RANCANG BANGUN RUMAH SUSUN, PONDOK CINA, DEPOK

##plugins.themes.academic_pro.article.main##

Illona Fatikah Andriyono
Agung Budi Broto

Abstract

In selecting the formwork work method, the things that need to be considered include cost, quality, and time. Comparison of several methods of formwork work is carried out to obtain the correct method. Comparisons were made to the Semi System formwork method and the Aluminum formwork method. To compare the two methods requires volume calculation, the multiplier coefficient referred to by the PUPR Regulation No. 28 / PRT / M / 2016, non-conformence data, and work duration. This data is processed into the need for the cost of formwork for the two methods based on the PUPR Ministerial Regulation Number 28 / PRT / 2016, the percentage of concrete defects due to formwork, and the scheduling duration presented in the bar chart. The two methods are compared based on the need for the cost of the work, the number of percent of quality, and the work duration. The comparison shows that the aluminum formwork method is superior in terms of cost (RAB). It is produced more efficiently by 3.4%. In terms of quality, this method results in less damage (concrete defects) to minimize repair costs later, and when the work reaches 43% more effective.


Keywords: Comparison, Formwork, Semi System Formwork, Aluminium Formwork.

##plugins.themes.academic_pro.article.details##

References

  1. A. Gazali, ALLFORM EFFECT Perubahan Paradigma untuk Efektivitas Pelaksanaan Proyek Gedung, Tangerang Selatan: Tim Proyek The AYOMA Apartment, 2018.
  2. I. Blackman and E. Chan, "Using Pareto Principle plus Statistic Methodology in Establishing a Cost Estimating Model," Proceedings of CIB World Building Congress, Brisbane, Australia, pp. 5-10, 2013.
  3. Jevica, "Faktor Preferensi Kontraktor Dalam Memilih Metode Aluminium Formwork Pada Pembangunan Apartemen," Universitas Agung Podomoro, Jakarta, 2019.
  4. M. Patel, P. J. Pitroda and P. Bhavsar, "RECENT SENARIO IN FORMWORK: ALUMINIUM FORMS," International Conference on: “Engineering: Issues, opportunities and Challenges for Development”, pp. 1-7, 2015.
  5. U. Chasanah and S., "PENERAPAN MANAJEMEN KONSTRUKSI DALAM PELAKSANAAN KONSTRUKSI," Jurnal Neo Teknika, vol. 3, pp. 35-39, 2017.
  6. K. Sahu, "Lean Six Sigma and Its Effectiveness," Nolegein Journal of Operations Research & Management, vol. 3, no. 1, 2020.
  7. A. Haris, "Perbandingan Biaya dan Waktu pada Pekerjaan Bekisting Struktur Utama dengan Metode Konvensional dan Sistem Feri," 09 September 2019. [Online]. Available: http://eprints.umm.ac.id/id/eprint/ 52128.
  8. I. Widiasanti and Lenggogeni, Manajemen Konstruksi, Bandung: PT. Remaja, 2013.
  9. S. Kiswati and U. Chasanah, "PENERAPAN KESEHATAN KESELAMATAN KERJA DALAM MANAJEMEN PELAKSANAAN PROYEK KONSTRUKSI DI PEMBANGUNAN GEDUNG RUMAH SAKIT," NeoTeknika, vol. 5, no. 2, pp. 7-12, 2019.
  10. K. Loganathan and K.E.Viswanathan, "A STUDY REPORT ON COST, DURATION AND QUALITY ANALYSIS OF DIFFERENT FORMWORKS IN HIGH-RISE BUILDING, "International Journal of Scientific & Engineering Research, vol. 7, no. 4, p. 190, 2016.
  11. A. S. Deshmukh and M. A. Shalgar, "Study of Tunnel Formwork versus Aluminium Formwork, "International Research Journal of Engineering and Technology (IRJET), vol. 03, no. 12, pp. 477-480, 2016.
  12. D. Ambara, "Perencanaan Biaya dan Waktu Pekerjaan Bekisting berdasarkan Metode Semi SIstem pada Proyek Pembangunan Jember Icon," Universitas Jember, Jember, 2016.
  13. J. Chotaliya and H. Rathod, "COMPARISON OF THE USE OF ALUMINIUM AND CONVENTIONAL FORMWORK SYSTEMS," INTERNATIONAL JOURNAL OF ADVANCED RESEARCH IN ENGINEERING, SCIENCE & MANAGEMENT, vol. 4, pp. 1-7, 2016.
  14. G. I. Djayasaputra and F. Hidayat, "Analisis Perbandingan Biaya, Waktu, Material, Dan Tata Laksana Pekerjaan Dinding Menggunakan Bata Ringan, Sandwich Panel Dan Beton Precast Pada Proyek Pembangunan Rumah Sakit “STC” Di Kota Jakarta.," repository.unpar.ac.id, 2018.
  15. L. Sihombing, "Dampak Covid- 19 pada Industri Konstruksi dan Tantangannya Pasca Covid-19 di Indonesia: Tinjauan dari Sisi Manajemen Keuangan Proyek, Program, dan Portofolio," ResearchGate, Mei 2020. [Online]. Available: https://www.researchgate.net/publication/341510564_Dampak_Covid-19_pada_Industri_konstruksi_dan_tantangannya_Pasca_COVID- 19_di_Indonesia_Tinjauan_dari_ sisi_Manajemen_Keuangan_Proy ek_Program_dan_Portofolio.
  16. A. Yasa, Ini Strategi Hutama Karya Saat Pandemi Covid-19, Ekonomi.Bisnis.com, 2020.